23

"Lunar Systems Progress Report No. 1, December 1961" (164pp., card, spiral) and "Progress Report No.

Currency:USD Category:Everything Else / Other Start Price:NA Estimated At:350.00 - 500.00 USD
 Lunar Systems Progress Report No. 1, December 1961  (164pp., card, spiral) and  Progress Report No.
"Lunar Systems Progress Report No. 1, December 1961" (164pp., card, spiral) and "Progress Report No. 2, April 1962" (140pp., card, spiral) These American Machine and Foundry Progress Reports were issued "to add to the basic knowledge and technical background gained by AMF participation in studies and contracts such as Prospector and Permanent Satellite Base. Report No. 1 summarizes the results of engineering efforts of this reporting period in the lunar traversing device area. It includes a brief description of subsystem surveys and the results to date of major system study areas. Report No. 2 presents the engineering accomplishments of the current period and the proposed lines of action for future program phases. To this end, the program has developed into three basic areas. The first of which is the study of initial unmanned mobile lunar surface probes. Because the current uncertainties of customer requirements in this area, little effort is being expended ... A second area of study is the previously mentioned manned surface traverser. This surface vehicle is currently being studied with the goal of fulfilling Apollo requirements as this appears to be the most promising area of future contractual work ...". An important pair of manuals. Ex: the Milton Weiss Estate collection.