5270

General Dynamics D-1 Centaur Rocket Working Photocopies (4 Volumes)

Currency:USD Category:Collectibles / Autographs Start Price:NA Estimated At:200.00 - 400.00 USD
General Dynamics D-1 Centaur Rocket Working Photocopies (4 Volumes)

Bidding Over

The auction is over for this lot.
The auctioneer wasn't accepting online bids for this lot.

Contact the auctioneer for information on the auction results.

Search for other lots to bid on...
Auction Date:2019 Apr 18 @ 18:00 (UTC-5 : EST/CDT)
Location:15th Floor WeWork, Boston, Massachusetts, 02108, United States
ALS - Autograph Letter Signed
ANS - Autograph Note Signed
AQS - Autograph Quotation Signed
AMQS - Autograph Musical Quotation Signed
DS - Document Signed
FDC - First Day Cover
Inscribed - “Personalized”
ISP - Inscribed Signed Photograph
LS - Letter Signed
SP - Signed Photograph
TLS - Typed Letter Signed
Uncommon grouping of four working photocopied General Dynamics folders from the Convair Aerospace Division, each consisting of one or more comprehensive reports relative to the testing and progress of the Centaur-D, the first version of the Centaur rocket to enter operational service.

The first binder includes the following reports (Date, Subject, Effectivity): May 24, 1973, Flight Constants Policy (D-1A (AC36 and on) and D-1T (TC-1 and on)); September 13, 1972, DCU Telemetry Data Processing Requirements (D-1 Centaur); March 30, 1972, DCU Telemetry Interrupt Processor Requirements (D-1 Centaur); March 15, 1972, Flight Initialization Software for D-1A (D-1A); September 23, 1971, Angle Re-entrant Subroutine (D-1 Centaur); December 17, 1971, Sine, Cosine Re-Entrant Subroutine (D-1 Centaur); December 17, 1971, Square Root Re-Entrant Subroutine (D-1 Centaur); February 9, 1971, Dot Product Re-Entrant Subroutine (D-1 Centaur); June 14, 1971, Vector Cross Product Re-Entrant Subroutine (D-1 Centaur); June 24, 1971, Matrix/Vector Multiply Re-Entrant Subroutine (D-1 Centaur); September 1, 1971, Discrete Priority Requirements (D-1 Centaur); October 17, 1971, Preprogrammed Booster Steering Requirements for Titan (D-1T); and June 6, 1972, Powered Phase Autopilot—D-1A/INTELSAY (D-1A Centaur)

The second binder, as follows: March 3, 1972, DCU Telemetry Data Formatter Software Requirements, and Inflight Data Formats (D-1A Centaur); April 4, 1973, Titan Steering Flight Software, Stages 0, 1, 2 (D-1T Proof Flight); and June 18, 1973, TC-1 Powered Guidance Equations (Pre-MECO 3) (D-1T).

The third binder: March 13, 1972, Sequencing Software Requirements—Pioneer G (D-1A Centaur); March 15, 1972, Atlas/Centaur/Pioneer G Guidance Equation Mission Peculiar Requirements (D-1A); April 5, 1972, Steering Interface—D-1A/Pioneer G (D-1A Centaur); and March 3, 1972, Atlas/Centaur/Pioneer G Post Injection Design Requirements (D1-A).

The fourth binder consists of a single report: March 12, 1973, AC-30 Pioneer G Flight Program; Definition Test Plan and Test Results (D-1A Centaur). Includes a ATLAS/Centaur promotional pamphlet from General Dynamics Convair Division. In overall very good to fine condition.