8385

Apollo 8 Flight Plan

Currency:USD Category:Collectibles / Autographs Start Price:NA Estimated At:200.00 - 400.00 USD
Apollo 8 Flight Plan

Bidding Over

The auction is over for this lot.
The auctioneer wasn't accepting online bids for this lot.

Contact the auctioneer for information on the auction results.

Search for other lots to bid on...
Auction Date:2020 Apr 16 @ 18:00 (UTC-05:00 : EST/CDT)
Location:15th Floor WeWork, Boston, Massachusetts, 02108, United States
ALS - Autograph Letter Signed
ANS - Autograph Note Signed
AQS - Autograph Quotation Signed
AMQS - Autograph Musical Quotation Signed
DS - Document Signed
FDC - First Day Cover
Inscribed - “Personalized”
ISP - Inscribed Signed Photograph
LS - Letter Signed
SP - Signed Photograph
TLS - Typed Letter Signed
Staple-bound official NASA manual entitled "Preliminary Flight Plan, Apollo 8, AS-503/CSM-103," 106 pages, 8 x 10.5, dated October 8, 1968, prepared by the Flight Planning Branch, Flight Crew Support Division at the Manned Spacecraft Center. The manual is comprised of five sections: General, Detailed Timeline, Consumables Analysis, Detailed Test Objectives, and Summary Flight Plan. Interior of manual features a few handwritten notations. In fine condition. Originates from the personal collection of Jack Stone, a Lockheed Electronics programmer who worked on the Consumable Analysis Team during the Apollo missions.

The identification code found on the front cover, “AS-503/CSM-103,” ended with “LM-3” on earlier examples of the Apollo 8 flight plan. The mission was initially intended to test the LM-3 in low Earth orbit as part of the first crewed flight of a lunar module, but the plan was canceled last minute when engineers determined that the spacecraft was still not ready. The recourse for Apollo 8 was then to use the CSM-103 to make the first manned lunar orbit, a decision some believe was urged by President Lyndon B. Johnson, who hoped to witness the first lunar flyby before leaving office. The crew of Apollo 8 orbited the moon 10 times in late December of 1968, with the Apollo 9 mission successfully testing the CSM and LM some three months later.